References
[1] Kacprzyk Z. Designing in the BIM process. Warsaw University of Technology Publishing House; 2020.
[2] ISO 19650-1:2018 Organization and digitization of information about buildings and civil engineering works including building information modeling (BIM) - Information management using building information modeling - Part 1: Concepts and principles. International Organization for Standardization; 2018.
[3] Borkowski A.S. “Evolution of BIM: epistemology genesis and division into periods”, Journal of Information Technology in Construction 28 (2023) 646–661. https://doi.org/10.36680/j.itcon.2023.034
[4] Sacks R., Brilakis I., Pikas E., et al., “Construction with digital twin information systems”, Data-Centric Engineering 1 (2020) e14. https://doi.org/10.1017/dce.2020.16
[5] Deng M., Menassa C.C., Kamat V.R., “From BIM to digital twins: A systematic review of the evolution of intelligent building representations in the AEC-FM industry”, Journal of Information Technology in Construction 26 (2021) 58–83. https://doi.org/10.36680/j.itcon.2021.005
[6] Kasznia D., Magiera J., Wierzowiecki P., BIM in practice. Standards, Implementation, Case Study. PWN Scientific Publishers; 2018.
[7] Abioye S.O., Oyedele L.O., Akanbi L., et al. “Artificial intelligence in the construction industry: A review of present status, opportunities and future challenges”, Journal of Building Engineering 44 (2021) 103299. https://doi.org/10.1016/j.jobe.2021.103299
[8] Ryciuk U., Rollnik-Sadowska E., Małaszkiewicz D., BIM - Conditions and perspectives of implementation in Poland. Bialystok University of Technology Publishing House; 2024.
[9] Kouider T., Sykes P., Hamma-Adama M., “BIM Manager, Coordinator, Consultant, Analyst… what does a confused AEC industry need?”, International Journal of BIM and Engineering Science 2(1) (2019) 67-88.
[10] Lu Q., Xie X., Heaton J., et al. “From BIM towards digital twin: strategy and future development for smart asset management. Service Oriented Holonic Multi-agent Manufacturing Systems”, 807 (2019) 392–404. https://doi.org/10.1007/978-3-030-27477-1_30
[11] Holzer D., Best Practice BIM: Excelling your BIM efforts. In: Holzer D., Best Practice BIM. Wiley-Blackwell; 2015. 175–205.
[12] Davies K., Wilkinson S., “A review of specialist role definitions in BIM guides and standards”, Journal of Information Technology in Construction 25 (2020) 281–303. https://www.itcon.org/2017/10
[13] Tantawy M., Kosbar L., Nour M., Mansour H., “Leveraging BIM for Proactive Dispute Avoidance in Construction Projects”, Buildings 15(9) (2025) 1401. https://doi.org/10.3390/buildings15091401
[14] Otranto T., Miceli M. Jr, Pellanda P.C., “BIM-FM Integration Through openBIM: Solutions for Interoperability Towards Efficient Operations”, Journal of Information Technology in Construction 30 (2025) 223-241. https://doi.org/10.36680/j.itcon.2025.012
[15] Chung S.W., Moon D.H., Choi J.S., Na W.S., Kwon S.W., “Smart Facility Management System Based on Open BIM and Augmented Reality Technology”, Applied Sciences 11(21) (2021) 10283. https://doi.org/10.3390/app112110283
[16] Tulke J., Schumann R., “BIM Manager”, In: Borrmann A, König M, Koch C, Beetz J, editors. Building Information Modeling: Technology Foundations and Industry Practice, Springer; 2018 419-427. https://doi.org/10.1007/978-3-319-92862-3
[17] UK BIM Framework. Information management according to BS EN ISO 19650 Guidance Part A: The information management function and resources, 2021. Available from: https://www.ukbimframework.org/wp-content/uploads/2021/02/Guidance-Part-A_The-information-management-function-and-resources_Edition-2.pdf
[18] Olugboyega O., “BIM leadership theory for organizational BIM transformation”, Frontiers in Built Environment 8 (2022) 1030403. https://doi.org/10.3389/fbuil.2022.1030403
[19] Crawford L., Profiling the Competent Project Manager. University of Technology Sydney, 2000.
[20] Aleman R.O., Assessing the Lack of Project Management Soft Skills Toward Project Completion Rates. Liberty University, 2023. Available from: https://digitalcommons.liberty.edu/doctoral/4309
[21] Hsu Y.C., Hsieh S.H., An Organizational Strategy for Developing and Managing BIM Talents in Design Firms. National Taiwan University, 2023. https://doi.org/10.6342/NTU202303396
[22] Bhati V., Architecture Beyond BIM: AI-Driven Design, Planning & Automation for Architects. 2025, Self-published by Amazon.
[23] EFCA Task Group. BIM and ISO 19650 from a project management perspective. European Federation of Engineering Consultancy Associations, 2019. Available from: https://www.efcanet.org/sites/default/files/2019-11/381783_EFCA_Flipbook_BIM%20gecorrigeerd2.pdf
[24] Aguilar Zavaleta J.P., The Future of BIM Using Artificial Intelligence Tools. César Vallejo University; 2025. https://doi.org/10.2139/ssrn.5265359
[25] Singh T., Mahmoodian M., Wang S., “Enhancing Open BIM Interoperability: Automated Generation of a Structural Model from an Architectural Model”, Buildings 14(8) (2024) 2475. https://doi.org/10.3390/buildings14082475
[26] Kutá D., Faltejsek M., The Role of Artificial Intelligence in the Transformation of the BIM Environment: Current State and Future Trends. VSB - Technical University of Ostrava, 2025.
[27] Huang Y., “Impacts of building information modeling (BIM) on communication network: A social capital perspective. PLOS ONE 17(8) (2022) e0272304. https://doi.org/10.1371/journal.pone.0275833
[28] Godager B., Onstein E., Huang L., “Towards an improved framework for enterprise BIM: the role of ISO 19650”, Journal of Information Technology in Construction 27 (2022) 1075-1103. https://doi.org/10.36680/j.itcon.2022.053
[29] Mohsen R., Nasreldin T.I., Hashem O.M., “The role of BIM as a lean tool in design phase”, Journal of Engineering and Applied Science 71 (2024) 15. https://doi.org/10.1186/s44147-023-00340-3
[30] Salamak M., BIM in the bridge life cycle. Wydawnictwo Naukowe PWN, 2021.
[31] Omer M.M., et al., Constructive and Destructive Leadership Behaviors, Skills, Styles and Traits in BIM-Based Construction Projects. Universiti Malaysia Pahang, 2022. https://doi.org/10.3390/buildings12122068
[32] Boton C., Forgues D., “Practices and Processes in BIM Projects: An Exploratory Case Study”, Advances in Civil Engineering 2018 (2018) 7259659. https://doi.org/10.1155/2018/7259659
[33] The AEC Associates. BIM and AI Integration: Reshaping the Future of AEC Industry [Internet]. 2024 [cited 2026 Jan 3]. Available from: https://theaecassociates.com/blog/bim-and-ai-integration/
[34] Ali K.N., Alhajlah H.H., Kassem M.A., “Collaboration and Risk in Building Information Modelling (BIM): A Systematic Literature Review”, Buildings 12(5) (2022) 571. https://doi.org/10.3390/buildings12050571
[35] Charsuwan P., Moriwaki T., Ichinose M., Alkhalaf H., “BIM-FM Interoperability Through Open Standards: A Critical Literature Review”, Architecture 5(3) (2025) 74. https://doi.org/10.3390/architecture5030074
[36] García-Alvarado J.M., Díaz-Cabrera J.M., Martín-Dorta N., González-Marrero A.M., Cabrera-Revilla J.L., “Enhancing BIM implementation in Spanish public procurement: A framework approach”, Heliyon 10(9) (2024) e30650. https://doi.org/10.1016/j.heliyon.2024.e30650
[37] Aleke C.U., Usang W.O., Obi-Obuoha A., Jolaosho A.A., Michael O.O., “Artificial Intelligence as a tool for enhancing Building Information Modeling (BIM)”, World Journal of Advanced Research and Review, 24(02) (2024) 1564–1572. https://doi.org/10.30574/wjarr.2024.24.2.3517
[38] Cheng J.C.P., Tayeh B.A., “Leveraging BIM for Sustainable Construction: Benefits Barriers and Best Practices”, Sustainability 16(17) (2024) 7654. https://doi.org/10.3390/su16177654
[39] Siebelink S., Voordijk H., Endedijk M., Adriaanse A., “Understanding barriers to BIM implementation: Their impact across organizational levels in relation to BIM maturity”, Frontiers of Engineering Management 8(2) (2021) 236–257. https://doi.org/10.1007/s42524-019-0088-2
[40] Ma S., “Research on construction management based on BIM-AR/VR technology”, E3S Web of Conferences 606 (2025) 04007. https://doi.org/10.1051/e3sconf/202560604007
[41] Johnston H., Machine-learning collaborations accelerate materials discovery. Physics World [Internet], 2023 [cited 2026 Jan 5]. Available from: https://physicsworld.com/a/machine-learning-collaborations-accelerate-materials-discovery/
[42] Brinker S., Hacking Marketing: Agile Practices to Make Marketing Smarter, Faster, and More Innovative. Wiley, 2016.
[43] Brinker S., Martec’s Law: Technology changes exponentially, organizations change logarithmically. Chief Martec [Internet], 2013 [cited 2026 Jan 5]. Available from: https://chiefmartec.com/2013/06/martecs-law-technology-changes-exponentially-organizations-change-logarithmically/
[44] Boje C., Guerriero A., Kubicki S., Rezgui Y., “Towards a semantic Construction Digital Twin: Directions for future research”, Automation in Construction 114 (2020) 103179. https://doi.org/10.1016/j.autcon.2020.103179
[45] Bilal M., Oyedele L.O., Qadir J., Munir K., Ajayi S.O., Akinade O.O., et al. “Big Data in the construction industry: A review of present status, opportunities, and future trends”, Advanced Engineering Informatics 30(3) (2016) 500-521. https://doi.org/10.1016/j.aei.2016.07.001
[46] Sawhney A., Riley M., Irizarry J., Construction 4.0: An Innovation Platform for the Built Environment. Routledge; 2020.
[47] Pan Y., Zhang L., “Roles of artificial intelligence in construction engineering and management: A critical review and future trends”, Automation in Construction 122 (2021) 103517. https://doi.org/10.1016/j.autcon.2021.103517
[48] Borkowski A.S., Kochański Ł., Rukat K., “Evolution of Convolutional and Recurrent Artificial Neural Networks in the Context of BIM: Deep Insight and New Tool, Bimetria”, Infrastructures 11(1) (2025) 6. https://doi.org/10.3390/infrastructures11010006
[49] Borkowski A.S., Automated “Identification of Heavy BIM Library Components: A Multi-Criteria Analysis Tool for Model Optimization”, Smart Cities 9(2) (2026) 22. https://doi.org/10.3390/smartcities9020022