[1]
2013. Preliminary identification and evaluation of parameters affecting the capacity of the operator-earthmoving machine system. Budownictwo i Architektura / Civil and Architectural Engineering. 12, 1 (Mar. 2013), 053–060. DOI:https://doi.org/10.35784/bud-arch.2173.