“Influence of Executive Imperfections of Railway Steel Bridges Construction on Operational Capacity and Fatigue Capacity”. 2013. Budownictwo I Architektura Civil and Architectural Engineering 12 (2): 071-078. https://doi.org/10.35784/bud-arch.2075.