SELECTION OF COMPENSATION WIND FARM EQUIPMENT CONNECTED TO THE NETWORK 110 KV


Abstract

Wind energy in Poland began to develop in the early 90s of the twentieth century, but its dynamic growth can be observed in subsequent years. At the end of 2014, the total installed capacity in wind farms in Poland amounted to 3 800 MW and continues to grow. The construction and installation of wind farms with high power brings with it a number of problems related to the compensation of the 110 kV cable lines of considerable length and the right type of compensation equipment. The article describes issues related to regulation of reactive power in wind farms and an analysis of individual compensation equipment used in wind energy.


Keywords

wind farms; compensation of reactive power; compensation device

Asghar Saqib M.: Power-quality issues and the need for reactive-power compensation in the grid integration of wind power. Renewable and Sustainable Energy Reviews Vol. 43/2015, 51–64.

Badyda K.: Energetyka wiatrowa Aktualne trendy rozwoju w Polsce. Energetyka 5/2013, 393–395.

Grządzielski I.: Sposoby kompensacji mocy biernej farm wiatrowych, Międzynarodowe Targi Energetyki Expopower, Poznań, 2010.

Kacejko P., Pijarski P., Adamek S.: Kompensacja linii kablowych 110 kV – możliwości i ograniczenia. ActaEnergetica 3/2015, 34–38.

Kacejko P., Pijarski P.: Przyłączanie farm wiatrowych – ograniczenia zamiast przewymiarowanych inwestycji. Rynek Energii 1(80), 2009, 10–15.

Kacejko P.: Inżynieria Elektryczna i Technologie Informatyczne w Nowoczesnych Technologiach Energetycznych, 2010.

Klucznik J.: Udział farm wiatrowych w regulacji napięcia w sieci dystrybucyjnej. Acta Energetica 1/2011, 39–45.

Lubośny Z.: Farmy wiatrowe w systemie elektroenergetycznym. WNT, 2010.

www.ioze.pl/energetyka-wiatrowa/generatory-elektrowni-wiatrowych [03.09.2015]

www.polishwindenergy.com/index.php/pl/component/content/article/90-elektrownia-wiatrowa-z-generatorem-asynchronicznym-klatkowym [03.06.2015]

www.pse.pl [25.09.2015]

www.winntbg.bg.agh.edu.pl/rozprawy2/10856/full10856.pdf [02.06.2015]


Published : 2016-02-04


Pijarski, P., & Gryniewicz-Jaworska, M. (2016). SELECTION OF COMPENSATION WIND FARM EQUIPMENT CONNECTED TO THE NETWORK 110 KV. Informatyka, Automatyka, Pomiary W Gospodarce I Ochronie Środowiska, 6(1), 47-50. https://doi.org/10.5604/20830157.1194275

Paweł Pijarski  p.pijarski@pollub.pl
Politechnika Lubelska, Katedra Sieci Elektrycznych i Zabezpieczeń  Poland
Michalina Gryniewicz-Jaworska 
Politechnika Lubelska, Instytut Informatyki  Poland