Ali, M., & Miller, L. (2017). ERP system implementation in large enterprises–a systematic literature review. Journal of Enterprise Information Management, 30(4), 666–692. https://doi.org/10.1108/JEIM-072014-0071
DOI: https://doi.org/10.1108/JEIM-07-2014-0071
Alotaibi, Y. (2016). Business process modelling challenges and solutions: a literature review. Journal of Intelligent Manufacturing, 27(4), 701–723. https://doi.org/10.1007/s10845-014-0917-4
DOI: https://doi.org/10.1007/s10845-014-0917-4
Andriolo, A., Battini, D., Grubbström, R. W., Persona, A., & Sgarbossa, F. (2014). A century of evolution from Harris’s basic lot size model: Survey and research agenda. International Journal of Production Economics, 155, 16-38. https://doi.org/10.1016/j.ijpe.2014.01.013
DOI: https://doi.org/10.1016/j.ijpe.2014.01.013
Bach, I., Bocewicz, G., Banaszak, Z. A., & Muszyński, W. (2010). Knowledge based and CP-driven approach applied to multi product small-size production flow. Control and Cybernetics, 39, 69–95.
Baker, K. R. (1989). Lot-sizing procedures and a standard data set: a reconciliation of the literature. Journal of Manufacturing and Operations Management, 2(3), 199–221.
Bocewicz, G., Nielsen, P., & Banaszak, Z. (2019). Declarative modeling of a milk-run vehicle routing problem for split and merge supply streams scheduling. Advances in Intelligent Systems and Computing, 853, 157–172. https://doi.org/10.1007/978-3-319-99996-8_15
DOI: https://doi.org/10.1007/978-3-319-99996-8_15
Bocewicz, G., Nielsen, P., Banaszak, Z., & Thibbotuwawa, A. (2018). Routing and scheduling of unmanned aerial vehicles subject to cyclic production flow constraints. In International Symposium on Distributed Computing and Artificial Intelligence (pp. 75–86). Springer, Cham. https://doi.org/10.1007/978-3-319-99608-0_9
DOI: https://doi.org/10.1007/978-3-319-99608-0_9
Box, G. E., Jenkins, G. M., & Reinsel, G. C. (2011). Time series analysis: forecasting and control (Vol. 734). John Wiley & Sons. https://doi.org/0.1111/jtsa.12194
De Bodt, M. A., Gelders, L. F., & Van Wassenhove, L. N. (1984). Lot sizing under dynamic demand conditions: A review. Engineering Costs and Production Economics, 8(3), 165–187. https://doi.org/10.1016/0167188X(84)90035-1
DOI: https://doi.org/10.1016/0167-188X(84)90035-1
Drexl, A., & Kimms, A. (1997). Lot sizing and scheduling—survey and extensions. European Journal of operational research, 99(2), 221–235. https://doi.org/10.1016/S0377-2217(97)00030-1
DOI: https://doi.org/10.1016/S0377-2217(97)00030-1
Eriksen, P. S., & Nielsen, P. (2016). Order quantity distributions: Estimating an adequate aggregation horizon. Management and Production Engineering Review, 7(3), 9–48. https://doi.org/10.1515/mper-2016-0024
DOI: https://doi.org/10.1515/mper-2016-0024
Fildes, R., Goodwin, P., Lawrence, M., & Nikolopoulos, K. (2009). Effective forecasting and judgmental adjustments: an empirical evaluation and strategies for improvement in supplychain planning. International journal of forecasting, 25(1), 3–23. https://doi.org/10.1016/j.ijforecast.2008.11.010
DOI: https://doi.org/10.1016/j.ijforecast.2008.11.010
Gola A. (2014) Economic Aspects of Manufacturing Systems Design. Actual Problems of Economics, 156(6), 205–212.
Grubbström, R. W., & Tang, O. (2012). The space of solution alternatives in the optimal lotsizing problem for general assembly systems applying MRP theory. International Journal of Production Economics, 140(2), 765777. https://doi.org/10.1016/j.ijpe.2011.01.012
DOI: https://doi.org/10.1016/j.ijpe.2011.01.012
Grubbström, R. W., Bogataj, M., & Bogataj, L. (2010). Optimal lotsizing within MRP theory. Annual Reviews in Control, 34(1), 89–100. https://doi.org/10.3182/20090603-3-RU2001.0562
DOI: https://doi.org/10.1016/j.arcontrol.2010.02.004
Heady, R. B., & Zhu, Z. (1994). An improved implementation of the Wagner-Whitin Algorithm. Production and Operations Management, 3(1), 55–63. https://doi.org/10.1111/j.1937-5956.1994.tb00109.x
DOI: https://doi.org/10.1111/j.1937-5956.1994.tb00109.x
Ho, C. J., & Ireland, T. C. (2012). Mitigating forecast errors by lot-sizing rules in ERP-controlled manufacturing systems. International Journal of Production Research, 50(11), 3080–3094. https://doi.org/10.1080/00207543.2011.592156
DOI: https://doi.org/10.1080/00207543.2011.592156
Hopp, W. J., & Spearman, M. L. (2011). Factory physics. Waveland Press.
Kazan, O., Nagi, R., & Rump, C. M. (2000). New lot-sizing formulations for less nervous production schedules. Computers & Operations Research, 27(13), 1325–1345. https://doi.org/10.1016/S0305-0548(99)00076-3
DOI: https://doi.org/10.1016/S0305-0548(99)00076-3
Kian, R., Berk, E., Gürler, Ü., Rezazadeh, H., & Yazdani, B. (2020). The effect of economies-ofscale on the performance of lot-sizing heuristics in rolling horizon basis. International Journal of Production Research, 1–15. https://doi.org/10.1080/00207543.2020.1730464
DOI: https://doi.org/10.1080/00207543.2020.1730464
Kourentzes, N., Trapero, J. R., & Barrow, D. K. (2020). Optimising forecasting models for inventory planning. International Journal of Production Economics, 225, 107597. https://doi.org/10.1016/j.ijpe.2019.107597
DOI: https://doi.org/10.1016/j.ijpe.2019.107597
Li, Q., & Disney, S. M. (2017). Revisiting rescheduling: MRP nervousness and the bullwhip effect. International Journal of Production Research, 55(7), 1992–2012. https://doi.org/10.1016/j.ijpe.2019.107597
DOI: https://doi.org/10.1080/00207543.2016.1261196
Mills, T. C. (2019). Applied Time Series Analysis: A Practical Guide to Modeling and Forecasting. Academic Press.
Moon, I., Yoo, D. K., & Saha, S. (2016). The distribution-free newsboy problem with multiple discounts and upgrades. Mathematical Problems in Engineering, 2017253. https://doi.org/10.1155/2016/2017253
DOI: https://doi.org/10.1155/2016/2017253
Nielsen, P., Jiang, L., Rytter, N. G. M., & Chen, G. (2014). An investigation of forecast horizon and observation fit’s influence on an econometric rate forecast model in the liner shipping industry. Maritime Policy & Management, 41(7), 667–682. https://doi.org/10.1080/03088839.2014.960499
DOI: https://doi.org/10.1080/03088839.2014.960499
Nilakantan, J. M., Li, Z., Tang, Q., & Nielsen, P. (2017). MILP models and metaheuristic for balancing and sequencing of mixed-model two-sided assembly lines. European Journal of Industrial Engineering, 11(3), 353-379. https://doi.org/10.1504/EJIE.2017.084880
DOI: https://doi.org/10.1504/EJIE.2017.084880
Patalas-Maliszewska, J. (2012). Assessing the Impact of Erp Implementation in the small Enterprises. Foundations of management, 4(2), 51-62. https://doi.org/10.2478/fman-2013-0010
DOI: https://doi.org/10.2478/fman-2013-0010
Patalas-Maliszewska, J., & Kłos, S. (2017). A Study on Improving the Effectiveness of a Manufacturing Company in the Context of Knowledge Management–Research Results. Foundations of Management, 9(1), 149160. https://doi.org/10.1515/fman-2017-0012
DOI: https://doi.org/10.1515/fman-2017-0012
Pedersen, C. H., Nedbailo, V., Knudsen, M. G., Olesen, J., & Toft, S. (2020). Analysis and development of an operations system. P4 Semester Project, GBE4 gr. 16/2.016. Global Business Engineering, Aalborg University.
Saha, S., Das, S., & Basu, M. (2010). Optimal pricing and production lot-sizing for seasonal products over a finite horizon. International Journal of Mathematics in Operational Research, 2(5), 540–553. https://doi.org/10.1504/IJMOR.2010.03434
DOI: https://doi.org/10.1504/IJMOR.2010.034340
Silver, E. A., & Meal, H. C. (1973). A heuristic for selecting lot size quantities for the case of a deterministic time-varying demand rate and discrete opportunities for replenishment. Production and Inventory Management, 2, 64–74.
Silver, E. A., Pyke, D. F., & Thomas, D. J. (2016). Inventory and production management in supply chains. CRC Press.
DOI: https://doi.org/10.1201/9781315374406
Silver, E., & Miltenburg, J. (1984). Two modifications of the SilverMeal lot sizing heuristic. INFOR: Information Systems and Operational Research, 22(1), 56–69. https://doi.org/10.1080/03155986.1984.11731912
DOI: https://doi.org/10.1080/03155986.1984.11731912
Świć, A., & Gola, A. (2013). Economic Analysis of Casing Parts Production in a Flexible Manufacturing System. Actual Problems of Economics, 141(3), 526–533.
Syntetos, A. A., Boylan, J. E., & Disney, S. M. (2009). Forecasting for inventory planning: a 50-year review. Journal of the Operational Research Society, 60, 149–S160. https://doi.org/10.1057/jors.2008.173
DOI: https://doi.org/10.1057/jors.2008.173
Syntetos, A. A., Nikolopoulos, K., & Boylan, J. E. (2010). Judging the judges through accuracyimplication metrics: The case of inventory forecasting. International Journal of Forecasting, 26(1), 134-143. https://doi.org/10.1016/j.ijforecast.2009.05.016
DOI: https://doi.org/10.1016/j.ijforecast.2009.05.016
Taneja, K., Ahmad, S., Ahmad, K., & Attri, S. D. (2016). Time series analysis of aerosol optical depth over New Delhi using Box–Jenkins ARIMA modeling approach. Atmospheric Pollution Research, 7(4), 585596. https://doi.org/10.1016/j.apr.2016.02.004
DOI: https://doi.org/10.1016/j.apr.2016.02.004
Van Den Heuvel, W., & Wagelmans, A. P. (2005). A comparison of methods for lot-sizing in a rolling horizon environment. Operations Research Letters, 33(5), 486–496. https://doi.org/10.1016/j.orl.2004.10.001
DOI: https://doi.org/10.1016/j.orl.2004.10.001
Wagner, H. M., & Whitin, T. M. (1958). Dynamic version of the economic lot size model. Management science, 5(1), 89-96. https://doi.org/10.1287/mnsc.5.1.89
DOI: https://doi.org/10.1287/mnsc.5.1.89
Xi, M. H., Wang, H. X., & Zhao, Q. H. (2012). Regression Based Integration of Demand Forecasting and Inventory Decision. Advanced Materials Research, 433, 2954–2956. https://doi.org/10.4028/www.scientific.net/AMR.433-440.2954
DOI: https://doi.org/10.4028/www.scientific.net/AMR.433-440.2954
Zabjek, D., Kovačič, A., & Štemberger, M. I. (2009). The influence of business process management and some other CSFs on successful ERP implementation. Business Process Management Journal, 15(4), 588–608. https://doi.org/10.1108/14637150910975552
DOI: https://doi.org/10.1108/14637150910975552