Historical crane on the redesigned original trestle bridge as a memorial of Gdansk Shipyard

Main Article Content

Jacek Chróścielewski

jacek.chroscielewski@wilis.pg.gda.pl

Mikołaj Miśkiewicz

mikolaj.miskiewicz@wilis.pg.gda.pl

Łukasz Pyrzowski

lukasz.pyrzowski@wilis.pg.gda.pl

Abstract

The paper includes selected aspects of the study, whose goal is to hold the historical crane 642-24 in its current location after the modification of trestle bridge static scheme. The scope of the paper includes the assessment of current technical condition of the object, a presentation of FEM analyses, a description of the assumed load cases, results of the static calculations, checking the effort of construction elements, global and local structure stability and its dynamic characteristics.

Keywords:

crane, Gdansk Shipyard, FEM analysis, expert opinion

References

Article Details

“Historical crane on the redesigned original trestle bridge as a memorial of Gdansk Shipyard” (2013) Budownictwo i Architektura / Civil and Architectural Engineering, 12(3), pp. 247–254. doi:10.35784/bud-arch.2039.