Historical crane on the redesigned original trestle bridge as a memorial of Gdansk Shipyard

Jacek Chróścielewski


Department of Structural Mechanics and Bridges; Faculty of Civil and Environmental Engineering; Gdansk University of Technology (Poland)
https://orcid.org/0000-0002-7648-2785

Mikołaj Miśkiewicz


Department of Structural Mechanics and Bridges; Faculty of Civil and Environmental Engineering; Gdansk University of Technology (Poland)
https://orcid.org/0000-0002-6936-6823

Łukasz Pyrzowski


Department of Structural Mechanics and Bridges; Faculty of Civil and Environmental Engineering; Gdansk University of Technology (Poland)
https://orcid.org/0000-0001-8704-1232

Abstract

The paper includes selected aspects of the study, whose goal is to hold the historical crane 642-24 in its current location after the modification of trestle bridge static scheme. The scope of the paper includes the assessment of current technical condition of the object, a presentation of FEM analyses, a description of the assumed load cases, results of the static calculations, checking the effort of construction elements, global and local structure stability and its dynamic characteristics.


Keywords:

crane, Gdansk Shipyard, FEM analysis, expert opinion

Gackowska E. Studium krajobrazowe Młodego Miasta ze szczególnym uwzględnieniem dźwigów. Biuro Rozwoju Gdańska, Gdańsk, 2012.
  Google Scholar

Ekspertyza techniczna dot. możliwości pozostawienia żurawia 642-24 na estakadzie B-5 (PK3, 291-46) w obecnej lokalizacji tj. od strony ul. Jana z Kolna po modyfikacji schematu statycznego. Opracowanie: KMBiM, Politechnika Gdańska. Gdańsk 2012.
  Google Scholar

Orzeczenie techniczne n/t możliwości przeniesienia dodatkowego obciążenia przez estakadę B-5 w przypadku zainstalowania żurawia nr 27 o ciężarze ok. 85T. Inwentaryzacja. Opracowanie: Centrum Techniki Wytwarzania Przemysłu okrętowego PROMOR. Gdańsk 1976.
  Google Scholar

Ocena stanu technicznego konstrukcji stalowej żurawia 642-24 zlokalizowanego na estakadzie PK3. Opracowanie: L. Marciniak, F. Szwajkowski. Gdańsk 1999.
  Google Scholar


Published
2013-09-11

Cited by

Chróścielewski, J., Miśkiewicz, M. and Pyrzowski, Łukasz (2013) “Historical crane on the redesigned original trestle bridge as a memorial of Gdansk Shipyard”, Budownictwo i Architektura, 12(3), pp. 247–254. doi: 10.35784/bud-arch.2039.

Authors

Jacek Chróścielewski 

Department of Structural Mechanics and Bridges; Faculty of Civil and Environmental Engineering; Gdansk University of Technology Poland
https://orcid.org/0000-0002-7648-2785

Authors

Mikołaj Miśkiewicz 

Department of Structural Mechanics and Bridges; Faculty of Civil and Environmental Engineering; Gdansk University of Technology Poland
https://orcid.org/0000-0002-6936-6823

Authors

Łukasz Pyrzowski 

Department of Structural Mechanics and Bridges; Faculty of Civil and Environmental Engineering; Gdansk University of Technology Poland
https://orcid.org/0000-0001-8704-1232

Statistics

Abstract views: 203
PDF downloads: 106


License

Creative Commons License

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.

Budownictwo i Architektura supports the open science program. The journal enables Open Access to their publications. Everyone can view, download and forward articles, provided that the terms of the license are respected.

Publishing of articles is possible after submitting a signed statement on the transfer of a license to the Journal.