Bridge over the Giełczew river in Piaski – building works quality control

Main Article Content

DOI

Maciej Kowal

m.kowal@pollub.pl

https://orcid.org/0000-0002-3849-5323

Abstract

Article describes rebuilding of the bridge from the side of works quality control. Tests carried out during construction time were performed with analyses and conclusions. In summary article presents how important is quality control on the building site as well appropriate selection and number of tests.

Keywords:

bridge building, quality inspection, tests during building

References

Article Details

Kowal, M. . (2010) “Bridge over the Giełczew river in Piaski – building works quality control”, Budownictwo i Architektura, 7(2), pp. 043–052. doi: 10.35784/bud-arch.2268.