Analysis of phase preparatory demolition of a building
Article Sidebar
Open full text
Issue Vol. 15 No. 2 (2016)
-
Scaffolding – regulations and practice
Michał Pieńko, Aleksander Robak, Ewa Błazik-Borowa005-012
-
Design details recognized as the reasons of defects of reinforced concrete floors in the multi-storey garage
Jerzy Szerafin, Anna Halicka013-018
-
The human factor and the effectiveness of protection against electric shock of users of electrical energy in buildings
Andrzej Sumorek019-027
-
Analysis of phase preparatory demolition of a building
Anna Sobotka, Joanna Sagan029-035
-
Fire automation in the life cycle of a building – methods of verification, issues with system upgrade
Wojciech Węgrzyński, Piotr Antosiewicz, Grzegorz Krajewski037-042
-
Modernist Estate of Lublin as an answer to demands of society – synergy aspect
Jan Wrana, Katarzyna Czapla043-050
-
Ventilated facades – problems of execution and acceptance of works
Ołeksij Kopyłow051-056
-
The actions of public administration bodies regarding building objects during their exploitation
Robert Lenarcik057-063
-
Impact assessment of effectiveness of thiourea and THAM for corrosion process on carbon steel in calcium chloride environment
Szymon Malinowski, Justyna Jaroszyńska-Wolińska064-072
-
Social utility properties of residential buildings in the light of the survey
Zygmunt Orłowski, Aleksandra Radziejowska073-078
-
The failure of the listed building as result of the realization of construction work in the neighbourhood
Tomasz Błaszczyński079-086
-
Regeneration of historic residential blocks in small city centers of Western Ukraine
Мaksym Yasinskyy087-100
-
Podzamcze in Lublin – spatial development and opinion on the building Nadstawna 2-4
Łukasz Borowski, Olga Skoczylas, Krzysztof Nepelski101-111
-
Revitalization as a synergistic effect
Katarzyna Szmygin113-118
Archives
-
Vol. 17 No. 4
2019-10-10 16
-
Vol. 17 No. 3
2019-10-10 15
-
Vol. 17 No. 2
2019-10-10 16
-
Vol. 17 No. 1
2019-10-10 21
-
Vol. 16 No. 4
2019-10-14 14
-
Vol. 16 No. 3
2019-10-14 15
-
Vol. 16 No. 2
2019-10-14 12
-
Vol. 16 No. 1
2019-10-15 20
-
Vol. 15 No. 4
2019-10-17 19
-
Vol. 15 No. 3
2019-10-15 13
-
Vol. 15 No. 2
2019-10-16 14
-
Vol. 15 No. 1
2019-10-09 28
-
Vol. 14 No. 4
2020-04-07 19
-
Vol. 14 No. 3
2020-04-15 25
-
Vol. 14 No. 2
2020-04-20 15
-
Vol. 14 No. 1
2020-04-25 14
-
Vol. 13 No. 4
2020-06-24 48
-
Vol. 13 No. 3
2020-06-24 43
-
Vol. 13 No. 2
2020-07-15 43
-
Vol. 13 No. 1
2020-07-15 30
Main Article Content
DOI
Authors
Abstract
Demolition can be a stand-alone construction project or its initial phase. As ach project consists of several stages, including the planning and preparation of demolition. In the paper the analysis of activities in the preparatory phase of the demolition, based on the requirements of legal acts, including the Construction Law.
Keywords:
References
[2] Rozporządzenie Ministra Infrastruktury z dnia 30 sierpnia 2004r. - w sprawie warunków i trybu postępowania w sprawach rozbiórek nieużytkowanych lub niewykończonych obiektów budowlanych (Dz. U. z 2004 r. Nr 198, poz. 2043).
[3] Ruch Budowlany w 2014 roku, Główny Urząd Nadzoru Budowlanego, Warszawa, 2015.
[4] Ustawa z dnia 11.08.2001 r. o szczególnych zasadach odbudowy, remontów i rozbiórek obiektów budowlanych, zniszczonych lub uszkodzonych w wyniku działania żywiołu (Dz. U. z 2001 r. Nr 84, poz. 906 z późn. zm.).
[5] Decyzja o pozwolenie na rozbiórkę nr 22/2013 wydana dla Akademii Górniczo-Hutniczej im. St. Staszica w Krakowie, z dnia 04.01.2013.
Article Details
Abstract views: 259
License

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Budownictwo i Architektura supports the open science program. The journal enables Open Access to their publications. Everyone can view, download and forward articles, provided that the terms of the license are respected.
Publishing of articles is possible after submitting a signed statement on the transfer of a license to the Journal.
