Time-Cost Relationship for Predicting Construction Duration
Article Sidebar
Open full text
Issue Vol. 12 No. 1 (2013)
-
Economic criteria for the selection of wall formwork
Sławomir Biruk, Piotr Jaśkowski007-014
-
Determination of the residential renovation range
Robert Bucoń, Anna Sobotka015-022
-
Time-Cost Relationship for Predicting Construction Duration
Agata Czarnigowska, Anna Sobotka023-030
-
Employing multi criteria optimisation methods for risk assessment of damage to bridge objects
Artur Duchaczek, Dariusz Skorupka031-038
-
Labor demand as a key factor in building process planning
Roman Marcinkowski039-046
-
Scheduling of building projects taking into account the time buffers determined on the basis of risk analysis
Mieczysław Połoński047-052
-
Preliminary identification and evaluation of parameters affecting the capacity of the operator-earthmoving machine system
Elżbieta Radziszewska-Zielina, Anna Sobotka, Edyta Plebankiewicz, Krzysztof Zima053-060
-
The cost analysis of steel halls designing, according to environmental standards, legal guidelines and market prices
Magdalena Rogalska, Zdzisław Hejducki061-068
-
The use of fuzzy databases and knowledge bases for aiding engineering projects
Janusz Szelka, Zbigniew Wrona069-076
-
Integrating Construction Process Documentation with the use of Building Information Modeling
Krzysztof Zima077-084
-
The influence of steel yielding of main reinforcement on bending capacity of beams strengthened with CFRP strips
Przemysław Bodzak085-090
-
Applications of truss topology optimization in the design of reinforced concrete structures using „Strut and Tie” models
Karol Bołbotowski, Michał Knauff, Tomasz Sokół091-098
-
The reliability of the support zone of beams formed with the use of ST models
Lidia Buda-Ożóg099-106
-
Influence of concrete topping on behaviour of prestressed Hollow Core floor slabs on flexible supports
Wit Derkowski, Mateusz Surma107-114
-
The influence of reinforcement temperature on stiffness of reinforced concrete beams in fire conditions
Michał Głowacki, Marian Abramowicz, Robert Kowalski115-122
-
The method of analysis of a reinforced concrete section under bending in the post-yield range
Jacek Korentz123-130
-
Efficiency analysis of strengthening of RC structures with prestressed CFRP composites
Renata Kotynia, Michał Staśkiewicz131-138
-
Diagonal crack width towards the experimental results
Rafał Ostromęcki139-146
-
The Influence of Concrete Strength on Shear Capacity of Reinforced Concrete Members without Shear Reinforcement
Marta Słowik151-158
-
Serviceability limit states of high performance reinforced concrete beams with hybrid fibre
Piotr Smarzewski155-162
-
The deformability of compressed concrete elements strengthened with FRCM composite materials
Tomasz Trapko163-170
-
Control of the transmission length in the prestressed hollow-core slabs using values of the strand end slip
Victor Tur, Stanisław Fic171-178
-
The structural fire design of concrete structures with externally bonded reinforcement and fire protection system
Piotr Turkowski179-186
-
The experimental investigations of RC internal columns in the connection zone with lightweight concrete slab
Tadeusz Urban, Michał Gołdyn, Łukasz Krawczyk187-194
-
The analysis of the effectiveness of different types of punching shear reinforcement not fully anchored
Tadeusz Urban, Michał Gołdyn, Łukasz Krawczyk195-202
-
The evaluation of uncertainty in the resistance models of reinforced concrete members
Szczepan Woliński203-210
-
Wind Tunnel Measurements of Aeroelastic Guyed Mast Models
Jarosław Bęc, Tomasz Lipecki, Ewa Błazik-Borowa211-218
-
The proposal of explicit account of the random character of design process parameters
Agnieszka Dudzik, Urszula Radoń219-226
-
Contribution to the diagnostics of rock bolts using elastic wave propagation
Magdalena Rucka227-234
-
The numerical analysis of micro-damage evolution in damaged element with structural discontinuity
Paweł Kossakowski235-242
-
Diagnostics of concrete plate in bending with ultrasonic waves modulated by low frequency oscillations
Błażej Meronk, Krzysztof Wilde243-250
-
Fracture toughness of old bridge steel
Eliza Mytych-Kumańska, Paweł Kossakowski251-258
-
Effect of random track irregularities on selected composite bridge / track structure / high-speed train system vibrations
Monika Podworna, Marian Klasztorny259-266
-
The analysis of the deformation of node in a modular scaffolding system
Michał Pieńko267-274
-
The analysis of stresses and displacements in the aluminium structure with replaceable elements
Beata Potrzeszcz-Sut, Ewa Pabisek275-282
-
The initial research of dynamic parameters for composite structures containing Zeolite
Jacek Szulej283-290
-
The tune of mass dampers for the Municipal Stadium in Poznan
Piotr Wielgos291-298
Archives
-
Vol. 14 No. 4
2020-04-07 19
-
Vol. 14 No. 3
2020-04-15 25
-
Vol. 14 No. 2
2020-04-20 15
-
Vol. 14 No. 1
2020-04-25 14
-
Vol. 13 No. 4
2020-06-24 48
-
Vol. 13 No. 3
2020-06-24 43
-
Vol. 13 No. 2
2020-07-15 43
-
Vol. 13 No. 1
2020-07-15 30
-
Vol. 12 No. 4
2020-09-04 24
-
Vol. 12 No. 3
2020-09-04 35
-
Vol. 12 No. 2
2020-09-04 37
-
Vol. 12 No. 1
2020-09-04 37
-
Vol. 11 No. 2
2020-12-02 11
-
Vol. 10 No. 1
2020-12-02 12
-
Vol. 9 No. 2
2020-12-02 11
-
Vol. 8 No. 1
2020-12-02 9
Main Article Content
DOI
Authors
Abstract
The paper aims at creating a model of road construction duration in the function of project qualities including the construction cost. The qualities considered are likely to be defined or possible to be estimated at early stages of project planning, giving no consideration to construction method or organisation of works. Potentially, the model might be applied by construction clients in their feasibility studies. It could also be used for comparing construction duration or construction rate with respect to project qualities.
Keywords:
References
Lai Y-T., Wang W-C., Wang H-H. AHP- and simulation-based budget determination procedure for public building construction projects. Automation in Construction 17 (2008) 623-632.
Lee J-R, Hsueh S-L, Tseng H-P. Utilizing data mining to discover knowledge in construction enterprise performance records. Journal of Civil Engineering and Management, 14 (2008) 79-84.
Kaplinski O. Modelling of Construction Processes: A Managerial Approach. KILiW PAN, IPPT, Studia z Zakresu Inżynierii Nr. 43, Warszawa, 1997.
Chou, J.-S., Tseng, H.-S., 2011. Establishing expert system for prediction based on the project-oriented data warehouse. Expert Systems with Applications, 38 (2011) 640-651.
Jin RZ, Cho KM, Hyu CT, Son MJ: MRA-based revised CBR model for cost prediction in the early stage of construction projects. Expert Systems with Applications, 39 (2012), 5214-5222 DOI: https://doi.org/10.1016/j.eswa.2011.11.018
Project management Body of Knowledge (PMBOK® Guide). Fourth Edition. Wydanie polskie. Management Training & Development Center, Warszawa, 2009.
Kaka A., Price A.D.F. Relationship between value and duration of construction projects. Construction Management and Economics 9 (1991) 383-400.
Chan A.P.C. Time-cost relationship of public sector projects in Malaysia. International Journal of Project Management, 19, 223-229. DOI: https://doi.org/10.1016/S0263-7863(99)00072-1
Yousef G., Baccarini D. Developing a cost-time model for estimating construction durations of sewerage projects in Perth. Journal of Construction Research 2 (2001) 213-220.
Ogunsemi D.R., Jagboro G.O.Time-cost model for building projects in Nigeria. Construction Management and Economics 24 (2006) 253-258.
Skitmore R.M., Ng S.T. Note. Australian project time-cost analysis: statistical analysis of intertemporal trends. Construction Management and Economics 19 (2001) 455-458.
Irfan, M., Khursid, M.B., Anastasopoulos, P., Labi, S., Moavenzadeh, F. Planning-stage estimation of highway project duration on the basis of anticipated project cost, project type, and contract type. International Journal of Project Management 29 (1) (2011)78-92. DOI: https://doi.org/10.1016/j.ijproman.2010.01.001
Skitmore R.M., Ng S.T. Forecast models of actual construction duration and cost. Building and Environment 38(8) (2003) 1075-1083. DOI: https://doi.org/10.1016/S0360-1323(03)00067-2
Love P. E. D., Tse R. Y. C., Edwards D.J. Time–Cost Relationships in Australian Building Construction Projects. Journal of Construction Engineering and Management, ASCE, 131(2) 2005 187-194. DOI: https://doi.org/10.1061/(ASCE)0733-9364(2005)131:2(187)
Stoy Ch., Polalis S. Early estimation of building construction speed in Germany. International Journal of Project Management 25 (2007) 283-289.
Martin J., Burrows T.K., Pegg I. Predicting Construction Duration of Building Projects. Shaping the Change XXIII FIG Congress, Munich, Germany, October 2006, 8-13.
BCIS Construction Duration Calculator http://www.rics.org, dostęp w styczniu 2013
Walker D.H.T. An investigation into construction time performance. Construction Management and Economics 13 (1995) 263-274. DOI: https://doi.org/10.1080/01446199500000030
Gatnar E. Nieparametryczna metoda dyskryminacji i regresji. PWN, Warszawa, 2001.
Stanisz A. Przystępny kurs statystyki z zastosowaniem STATISTICA PL na przykładach z medycyny. Tom 2. Modele liniowe i nieliniowe. Statsoft Polska, Krakow, 2007.
Article Details
Abstract views: 318
License

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Budownictwo i Architektura supports the open science program. The journal enables Open Access to their publications. Everyone can view, download and forward articles, provided that the terms of the license are respected.
Publishing of articles is possible after submitting a signed statement on the transfer of a license to the Journal.